{"format":"cadcraft-library-item","format_version":1,"uuid":"995ebb26-0386-4fc6-b515-1711891e87f4","version":1,"name":"Portland, Oregon: residential building permit (process, submission, conventions)","kind":"regulation","category":"regulations/building","description":"Process, submission format and drawing conventions read on 2026-11-11 from the City of Portland pages cited, in our own words. Not confirmed by a Portland practitioner; the City decides what it requires. No building rules: Oregon's code is not in this pack. Sheet size, title block contents, maximum file size and fee amounts are not on the pages read and are left out.","maker":"","model":"","ifc":{"class":"IfcControl","predefined":"NOTDEFINED"},"plan":{"layers":[],"entities":[]},"body":null,"params":{},"regulation":{"format":"cadcraft-regulation-pack","version":1,"id":"us-or-portland","name":"Portland, Oregon: residential building permit (process, submission, conventions)","jurisdiction":{"country":"US","level":"city","region":"OR","name":"City of Portland, Oregon"},"base":null,"edition":"pages read 2026-11-11","in_force":null,"review":{"state":"draft","note":"Process, submission format and drawing conventions read on 2026-11-11 from the City of Portland pages cited, in our own words. Not confirmed by a Portland practitioner; the City decides what it requires. No building rules: Oregon's code is not in this pack. Sheet size, title block contents, maximum file size and fee amounts are not on the pages read and are left out."},"authority":"government","source":{"name":"City of Portland, Portland Permitting & Development","url":"https://www.portland.gov/ppd/get-permit","date":"","checked":"2026-11-11"},"maker":null,"price":null,"criteria":[],"tables":[],"rules":[],"release":{"version":"0.1.0","changelog":[{"version":"0.1.0","date":"2026-11-11","added":["Added: approval steps, submission format, required drawings with scales, supporting documents and drawing conventions for a Portland residential permit, read 2026-11-11 (first version of this pack)"]}]},"process":{"authority":"City of Portland, Portland Permitting & Development","summary":"Residential building permit: apply online through the City's portal, review with correction sheets, pre-issuance check, then the permit is emailed.","sources":[{"title":"City of Portland, Portland Permitting & Development: Get a permit","url":"https://www.portland.gov/ppd/get-permit","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."},{"title":"City of Portland: Submit plans online (Single PDF Process)","url":"https://www.portland.gov/ppd/get-permit/submit-plans-online","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."},{"title":"City of Portland: Building permit plans for residential projects","url":"https://www.portland.gov/ppd/get-permit/building-permit-plans","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."},{"title":"City of Portland: File naming standards and preparing PDFs","url":"https://www.portland.gov/ppd/spp-file-naming-standards-preparing-pdfs","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."}],"steps":[{"id":"research","title":"Research the property, zoning and codes","who":"Applicant","handIn":"Nothing","documents":[],"detail":"A free 15-minute appointment is offered.","clause":"Step 1","source":0},{"id":"prepare","title":"Prepare the application, plans and supporting documents","who":"Applicant","handIn":"Nothing yet","documents":["Building Permit Application PDF","Drawing set","Supporting documents"],"detail":"","clause":"Step 2","source":0},{"id":"apply","title":"Apply online and pass the intake check","who":"Applicant; a permit technician checks minimum standards","handIn":"The application, the drawings (one PDF) and the supporting documents (separate PDFs)","documents":[],"detail":"Applications of 35 pages and under may use the Single PDF Process; larger ones use another process the page does not describe. Paper plans may need an in-person appointment.","clause":"Steps 3; Single PDF Process: Intake","source":1},{"id":"intake-fees","title":"Pay the intake fees","who":"Applicant","handIn":"Intake fees, so reviews can start","documents":[],"detail":"","clause":"Step 4","source":0,"fee":{"text":"Fees are based on the estimated cost of construction and materials; no amounts are on the page","source":0}},{"id":"review","title":"Review and corrections","who":"City reviewers; applicant answers every checksheet item","handIn":"Revised drawings uploaded for each checksheet, repeated until every review is approved","documents":[],"detail":"The page points to a timelines page updated weekly and states no number of days.","clause":"Step 5; Single PDF Process: Corrections","source":1},{"id":"pre-issuance","title":"Final check before issuance","who":"City","handIn":"Outstanding fees","documents":[],"detail":"The City checks approval stamps, notes and fees.","clause":"Step 5","source":0},{"id":"issue","title":"Receive the permit and approved plans","who":"City emails; applicant prints","handIn":"Permit fees","documents":[],"detail":"The approved plans arrive as a link; the page says it is available for 60 days and that no printed set is provided. Permits expire 180 days after the Under Review date unless extended or reactivated.","clause":"Steps 6 and 7; Single PDF Process: Issuance","source":1}]},"submission":{"authority":"City of Portland, Portland Permitting & Development","summary":"Plans for a residential building permit, uploaded through the City's online Single PDF Process.","sources":[{"title":"City of Portland, Portland Permitting & Development: Get a permit","url":"https://www.portland.gov/ppd/get-permit","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."},{"title":"City of Portland: Submit plans online (Single PDF Process)","url":"https://www.portland.gov/ppd/get-permit/submit-plans-online","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."},{"title":"City of Portland: Building permit plans for residential projects","url":"https://www.portland.gov/ppd/get-permit/building-permit-plans","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."},{"title":"City of Portland: File naming standards and preparing PDFs","url":"https://www.portland.gov/ppd/spp-file-naming-standards-preparing-pdfs","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."}],"format":{"orientation":"landscape","fileFormats":["pdf"],"singleFile":true,"fileNaming":"Under 50 characters, with no permit numbers, addresses or identifiers; calculation packets named Supplemental or Replacement.","copies":{"text":"One set online; four sets if submitted in person. One set is stamped and returned for the job site.","paper":4,"electronic":1},"stampSpace":"Leave room for the City stamp in the top-right or bottom-right corner of each drawing.","note":"Drawings in one PDF; application, calculations and other documents as separate PDFs. Disable font embedding; scans at 150 dpi; no digitally signed or permission-protected PDFs.","source":3},"drawings":[{"id":"site-plan","title":"Site plan","detail":"The entire lot at a scale of at least 1 inch = 10 feet, showing where the building sits relative to the property lines and other buildings.","clause":"Site plan","when":"always","source":2,"scale":{"text":"at least 1 in = 10 ft (1:120 or larger)","maxDenominator":120},"satisfy":[{"words":["site plan"]}],"site":true},{"id":"floor-plans","title":"Floor plans","detail":"One for each level where work occurs, existing and proposed, at 1/4 inch = 1 foot: all walls, room sizes and uses, a north arrow, windows with size and type, stairs and smoke detectors; bearing walls, headers and beams here or on framing plans.","clause":"Floor plans","when":"always","source":2,"satisfy":[{"view":["plan"]},{"words":["floor plan"]}],"site":false},{"id":"roof-plan","title":"Roof plan","detail":"A roof plan.","clause":"Floor plans","when":"always","source":2,"satisfy":[{"words":["roof plan","roof"]}],"site":false},{"id":"foundation","title":"Foundation plan","detail":"For new buildings and additions: layout, dimensions and details of slabs, footings and reinforcing steel, concrete strength, crawl space access and foundation vents.","clause":"Foundation plan","when":"if-applicable","source":2,"satisfy":[{"words":["foundation"]}],"site":false},{"id":"sections","title":"Section drawings","detail":"Full sections usually at least 1/4 inch = 1 foot; wall sections and details at least 1/2 inch = 1 foot. Footings, foundation wall height, member sizes and spacing, coverings, insulation, ceiling heights; stair details for new or changed stairs.","clause":"Section drawings","when":"always","source":2,"scale":{"text":"full sections at least 1/4 in = 1 ft (1:","maxDenominator":48},"satisfy":[{"view":["section"]},{"words":["section"]}],"site":false},{"id":"elevations","title":"Building elevation drawings","detail":"For any exterior change, normally at 1/4 inch = 1 foot: ground level and slope at the building, windows and doors, siding and roofing, guardrails.","clause":"Building elevation drawings","when":"if-applicable","source":2,"satisfy":[{"view":["elevation"]},{"words":["elevation"]}],"site":false},{"id":"framing","title":"Framing plans and structural details","detail":"Separate framing plans where load-bearing members are not on the floor plans; structural sections or details for more complex work.","clause":"Floor plans; Section drawings","when":"if-applicable","source":2,"satisfy":[{"words":["framing","structural"]}],"site":false}],"documents":[{"id":"application-form","title":"Building Permit Application (PDF form)","detail":"The completed application form; uploaded as its own PDF, not inside the drawing set.","clause":"Get a permit, step 2","when":"always","source":0},{"id":"structural-calcs","title":"Structural calculations","detail":"For projects that change structural elements; uploaded as a separate PDF.","clause":"Get a permit, step 2; Submit plans online","when":"if-applicable","source":0},{"id":"product-specs","title":"Product specifications","detail":"Listed among the supporting documents.","clause":"Get a permit, step 2","when":"if-applicable","source":0},{"id":"geotech","title":"Geotechnical report","detail":"Listed among the supporting documents.","clause":"Get a permit, step 2","when":"if-applicable","source":0},{"id":"property-line-survey","title":"Surveyed location of the property line","detail":"Listed among the supporting documents.","clause":"Get a permit, step 2","when":"if-applicable","source":0}]},"conventions":{"sources":[{"title":"City of Portland: Building permit plans for residential projects","url":"https://www.portland.gov/ppd/get-permit/building-permit-plans","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."},{"title":"City of Portland: File naming standards and preparing PDFs","url":"https://www.portland.gov/ppd/spp-file-naming-standards-preparing-pdfs","fetched":"2026-11-11","licence":"Page copyright City of Portland. Only the facts are listed here, in our own words; no text is copied."}],"text":[{"id":"notes","use":"Notes","kind":"text","clause":"Plans you need: legibility","min":false,"source":0,"pt":12},{"id":"dimensions","use":"Dimensions","kind":"dimension","clause":"Plans you need: legibility","min":false,"source":0,"pt":12}],"lines":[],"marks":[{"id":"north-arrow","label":"North arrow on floor plans","required":true,"clause":"Floor plans","source":0},{"id":"scale","label":"Scale shown on each drawing; scale bar or reference scale on all drawings","required":true,"clause":"Scale; PDF preparation","source":1},{"id":"no-colour","label":"Black line work only: drawings may not contain colour","required":true,"clause":"Legibility","source":0},{"id":"stamp-space","label":"Space for the City stamp in a right-hand corner","required":true,"clause":"PDF preparation","source":1}],"note":"Line weights and standard notes are not stated on the pages read."}},"source_attrs":{},"license":{"id":"CC0-1.0","holder":"CadCraft","attribution":"“Portland, Oregon: residential building permit (process, submission, conventions)” by CadCraft (https://www.portland.gov/ppd/get-permit), CC0 (https://creativecommons.org/publicdomain/zero/1.0/)","url":"https://creativecommons.org/publicdomain/zero/1.0/"},"provenance":{"library":"librarycraft","item":"995ebb26-0386-4fc6-b515-1711891e87f4","version":1,"sha256":"50a827af43705983b2033c83e79c16ecf98ec89ec8727861e9685545e22a0f01","source_file":"us-or-portland.json","source_sha256":"f5b00c16b2e49f030b167abcd55394e9cec6d4544b83f43e9620e77703a084b3","published_at":"2026-11-17T04:26:21Z"}}