Release planning

CadCraft 0.7 impact map

What is left from 0.6 and what comes next: every item that was not finished when 0.6 shipped moved here with its status, plus new requests. 0.6 itself keeps what was built.

ProjectCadCraft
Sheet0.7 impact
Items148
Date2026-10-21
6Fix
71Feature
2Spike
7Platform
5Site ops
18Sanity check
39Decision
≈ 21days in the planned and moved items
  • Planned 31 0.6 part 1 or part 2 list
  • Built 1 built and working in /lab (the dev builds); ships with 0.6
  • Partly built 19 part of it is built in /lab; the rest waits (see "Waits on")
  • Promised 2 the live site already says 0.6
  • Moved 1 moved from the 0.5 wishlist
  • Found 0 bug found after 0.5 shipped; 0.5.1 or 0.6
  • Candidate 47 recommended for 0.6 in a spike or session log; owner to choose
  • Community please test 14 built and in /use; a Discord post gives the steps and the expected result and asks people to try it on their own devices, files or know-how
  • Decision Time 33 a decision, check, file, key, flag or go only you can give; folds into the list once answered

Sheet 1 · impact areas

Where 0.7 lands

How many items touch each app and each layer, by kind. One item can touch several areas, so the rows add up to more than the item count. Pick a row to filter the schedule below.

Impact areaFixFeatureSpikePlatformSite opsSanity checkDecisionAll
Apps
CadCraft 4 37 1 – – 6 14 62
BimCraft – 24 – – – 5 10 39
ModelCraft – 14 1 – – 6 5 26
MarkupCraft – 7 – – – 2 1 10
TakeoffCraft – 5 – – – 3 3 11
CivilCraft – 8 – – – 2 3 13
DetailCraft – 5 – – – 2 2 9
PartCraft – 14 1 – – 8 8 31
Studio 2 12 – 7 1 7 8 37
SuperCadCraft – – – – – – – 0
Layers
Site and services – 9 – 3 2 – 21 35
Desktop host – 4 – 6 – 4 3 17
App shell – 3 – – – 1 1 5
App code – 28 – – – 2 9 39
Our engines – 5 1 – – 1 1 8
Vendor engines – 4 – – – – 2 6
Drawing surface – 5 – – – 1 – 6
Help and words – 4 1 – – 1 2 8
Tests and tooling – 2 1 – – – 3 6

Sheet 2 · schedule

Every fix and feature

Grouped by track. App chips carry each app’s layer colour; Studio is in ink. "Waits on" names what has to happen first; the small lines under it say who asked and where the item is written up.

Add an item Fork map (Rust and C++ forks) The roadmap

Issues sync every 10 minutes; last sync Oct 21, 2026 10:00 pm.

ItemWhatAppsLayersStatusDaysWaits onIssues
Decision Time 42
DecisionOLD-GPL Link to OLD-GPL Retire old releases with GPL code

Retire the frozen 0.1–0.4 folders that still load libredwg-web, Pyodide or OpenCascade.

CadCraftBimCraftModelCraftPartCraft Vendor enginesSite and services Decision Time – You: decision From: asked of the owner by: TASKS; libredwg-retired (Session) TASKS; libredwg-retired
Recommended for 0.6, owner to choose 4
FeaturePT-GPU Link to PT-GPU WebGPU path tracer

The WebGL path tracer is deprecated upstream; moving needs WebGPU everywhere we run plus three’s WebGPU build.

BimCraftModelCraft Vendor enginesDrawing surface Candidate – – From: render session (Session) render log
Suggest an item

Anyone can send one; no account and no name needed. The team reads each idea, and the ones we take on appear on this page. Please leave out web addresses.