Release planning

CadCraft 0.7 impact map

What is left from 0.6 and what comes next: every item that was not finished when 0.6 shipped moved here with its status, plus new requests. 0.6 itself keeps what was built.

ProjectCadCraft
Sheet0.7 impact
Items148
Date2026-10-21
6Fix
71Feature
2Spike
7Platform
5Site ops
18Sanity check
39Decision
≈ 21days in the planned and moved items
  • Planned 31 0.6 part 1 or part 2 list
  • Built 1 built and working in /lab (the dev builds); ships with 0.6
  • Partly built 19 part of it is built in /lab; the rest waits (see "Waits on")
  • Promised 2 the live site already says 0.6
  • Moved 1 moved from the 0.5 wishlist
  • Found 0 bug found after 0.5 shipped; 0.5.1 or 0.6
  • Candidate 47 recommended for 0.6 in a spike or session log; owner to choose
  • Community please test 14 built and in /use; a Discord post gives the steps and the expected result and asks people to try it on their own devices, files or know-how
  • Decision Time 33 a decision, check, file, key, flag or go only you can give; folds into the list once answered

Sheet 1 · impact areas

Where 0.7 lands

How many items touch each app and each layer, by kind. One item can touch several areas, so the rows add up to more than the item count. Pick a row to filter the schedule below.

Impact areaFixFeatureSpikePlatformSite opsSanity checkDecisionAll
Apps
CadCraft 4 37 1 – – 6 14 62
BimCraft – 24 – – – 5 10 39
ModelCraft – 14 1 – – 6 5 26
MarkupCraft – 7 – – – 2 1 10
TakeoffCraft – 5 – – – 3 3 11
CivilCraft – 8 – – – 2 3 13
DetailCraft – 5 – – – 2 2 9
PartCraft – 14 1 – – 8 8 31
Studio 2 12 – 7 1 7 8 37
SuperCadCraft – – – – – – – 0
Layers
Site and services – 9 – 3 2 – 21 35
Desktop host – 4 – 6 – 4 3 17
App shell – 3 – – – 1 1 5
App code – 28 – – – 2 9 39
Our engines – 5 1 – – 1 1 8
Vendor engines – 4 – – – – 2 6
Drawing surface – 5 – – – 1 – 6
Help and words – 4 1 – – 1 2 8
Tests and tooling – 2 1 – – – 3 6

Sheet 2 · schedule

Every fix and feature

Grouped by track. App chips carry each app’s layer colour; Studio is in ink. "Waits on" names what has to happen first; the small lines under it say who asked and where the item is written up.

Add an item Fork map (Rust and C++ forks) The roadmap

Issues sync every 10 minutes; last sync Oct 21, 2026 8:20 pm.

ItemWhatAppsLayersStatusDaysWaits onIssues
Moved from the 0.5 wishlist 2
FeatureWL.7 Link to WL.7 Library items in your language

Optional translated names, types and parameter labels in the item format, shown in the session’s language in apps and schedules.

CadCraftBimCraft App codeSite and services Partly built 1.5 – From: Revit ideas board, Jun 2026 (Ideas board) 0.5-PLAN WL.7
FeatureWL.26 Link to WL.26 Feature lines shared between projects

A data reference that updates when the source changes.

CivilCraft App codeSite and services Moved 1.5 Team projects (parked) From: Civil 3D ideas board, Nov 2025 (Ideas board) 0.5-PLAN WL.26
One lineup (consolidation) 19
FeatureLC.2 Link to LC.2 Working together in the cloud

Covers Forma Design Collaboration, BIM Collaborate and Docs. Team projects across every app, versions, comments and BCF issues on any file, a federated team model, notifications. Restarts "Working together, step 2". Discord CSV 2026-10-21: Asked again on Discord (#SolidCraft Oct 17; #technical-development Oct 17): save to Google Drive or other cloud folders, a shared cloud-storage brick for all apps, real-time collaboration across all apps. Cloud folders on B2 are specced (docs/CLOUD-FOLDERS-SPEC.md); synced Drive/OneDrive folders work today through the folder picker.

CadCraftBimCraftModelCraftMarkupCraftTakeoffCraftCivilCraftDetailCraftPartCraftStudio Site and servicesDesktop hostApp shell Candidate 8–10 Owner: B2 driver, SYNC_PUBLIC From: owner (Owner) 0.6-PART3 LC.2
FeatureLC.8 Link to LC.8 Parts vault

Covers Vault and Fusion Manage. Check-in and check-out, revisions and release states, where-used and BOMs from PartCraft and CadCraft, an approval step.

CadCraftPartCraftStudio Site and servicesApp code Candidate 6 LC.2 From: owner (Owner) 0.6-PART3 LC.8
FeatureLC.12 Link to LC.12 Digital twin for operations

Covers Tandem. The handed-over IFC as a facility model: asset data, spaces, systems, documents, sensor values from CSV or a feed, a maintenance list. Spike first.

BimCraft App codeSite and services Partly built 1 + 6 – From: owner (Owner) 0.6-PART3 LC.12
FeatureLC.13 Link to LC.13 Bidding

Covers Forma for Preconstruction, BuildingConnected, Bid Board Pro and TradeTapp. Bid packages from a TakeoffCraft estimate, invitations, prices back, a leveling sheet, subcontractor records.

TakeoffCraft Site and servicesApp code Partly built 6 – From: owner (Owner) 0.6-PART3 LC.13
FeatureLC.14 Link to LC.14 Product configurators

Covers Configurator 360 and Informed Design. A PartCraft configuration published as a configurator page with 3D and DWG/STEP/IFC downloads; the same item parametric in BimCraft.

BimCraftPartCraft Site and servicesApp code Partly built 5 – From: owner (Owner) 0.6-PART3 LC.14
Decision Time 42
FeatureUPDATES Link to UPDATES Turn on Studio auto-updates

The updater is built but off: it needs your update signing key, a release feed, and decision 10 (checks on by default?). a Discord member asked on Discord. -- We'll allow Studio settings to have on by default and checkmark can be turned off; Will need a "check for updates" - report current and latest version. Discord CSV 2026-10-21: Before it turns on: D7.54 (three updater bugs found 2026-10-21 — the What's new card nags with updates off, the feed lists only Windows x64, errors read as “network”).

Studio Site and servicesDesktop host Candidate – You: key + decision From: Discord community (Discord) updates.rs, Discord
Drafting and app features 14
FeatureLG.4 Link to LG.4 Indonesian draft named on the site

Wherever the site or release notes name the Spanish draft, name the Indonesian draft the same way. Written for the owner, applied on the go for the release.

– Site and servicesHelp and words Built 0.25 – From: owner (Owner) 0.6-PART2 LG.4
Suggest an item

Anyone can send one; no account and no name needed. The team reads each idea, and the ones we take on appear on this page. Please leave out web addresses.