Release planning

CadCraft 0.7 impact map

What is left from 0.6 and what comes next: every item that was not finished when 0.6 shipped moved here with its status, plus new requests. 0.6 itself keeps what was built.

ProjectCadCraft
Sheet0.7 impact
Items115
Date2026-10-26
10Fix
88Feature
3Spike
3Platform
2Site ops
9Sanity check
0Decision
≈ 0days in the planned and moved items
  • Planned 0 0.6 part 1 or part 2 list
  • Built 115 built and working in /lab (the dev builds); ships with 0.6
  • Partly built 0 part of it is built in /lab; the rest waits (see "Waits on")
  • Promised 0 the live site already says 0.6
  • Moved 0 moved from the 0.5 wishlist
  • Found 0 bug found after 0.5 shipped; 0.5.1 or 0.6
  • Candidate 0 recommended for 0.6 in a spike or session log; owner to choose
  • Community please test 0 built and in /use; a Discord post gives the steps and the expected result and asks people to try it on their own devices, files or know-how
  • Decision Time 0 a decision, check, file, key, flag or go only you can give; folds into the list once answered

Sheet 1 · impact areas

Where 0.7 lands

How many items touch each app and each layer, by kind. One item can touch several areas, so the rows add up to more than the item count. Pick a row to filter the schedule below.

Impact areaFixFeatureSpikePlatformSite opsSanity checkDecisionAll
Apps
CadCraft 4 38 – 2 – 4 – 48
BimCraft 3 34 1 2 – 6 – 46
ModelCraft – 21 3 2 – 3 – 29
MarkupCraft – 16 – 2 – 2 – 20
TakeoffCraft 1 15 – 2 – 2 – 20
CivilCraft – 34 – 2 – 3 – 39
DetailCraft – 16 – 2 – 2 – 20
PartCraft – 23 2 2 – 4 – 31
Studio 2 8 – 1 1 – – 12
SuperCad Studio – – – – – – – 0
Layers
Site and services – 4 – – – – – 4
Desktop host – – – – – – – 0
App shell 1 13 – 2 – – – 16
App code 2 28 – – – – – 30
Our engines – 4 – – – – – 4
Vendor engines – 2 – – – – – 2
Drawing surface 3 4 – – – – – 7
Help and words – 3 – – – 1 – 4
Tests and tooling – – – 1 – 3 – 4

Sheet 2 · schedule

Every fix and feature

Grouped by track. App chips carry each app’s layer colour; Studio is in ink. "Waits on" names what has to happen first; the small lines under it say who asked and where the item is written up.

Add an item Fork map (Rust and C++ forks) The roadmap

Issues sync every 10 minutes; last sync Oct 26, 2026 10:50 pm.

ItemWhatAppsLayersStatusDaysWaits onIssues
Suggestions from /suggest (Oct 14–20) 8
Sanity checkSU.751 Link to SU.751 BimCraft: rough-edges pass

Asked: BimCraft polished more than anything; there is no free alternative, and the current build needs polish to be useful (#751, Oct 16; no email left). Do: a day on /use BimCraft as a new user (open, draw a small house with BimCraft Draw, schedules, plan PDF, IFC out), every snag written down and fixed or filed; ask on Discord what feels rough (DISCORD-ASK). Session `bim-07` (wave 2).

BimCraft Built 2 session bim-07 From: site suggestion (Suggestion) /admin/suggestions, reviewed 2026-10-22
Suggest an item

Anyone can send one; no account and no name needed. The team reads each idea, and the ones we take on appear on this page. Please leave out web addresses.