Know the ground
Points, breaklines and surfaces
Build a terrain model from survey inputs and inspect the assumptions behind the surface.
Civil work starts with measured ground and ends with decisions about grades, drainage, quantities and buildability. The goal is a traceable path from source geometry to the plan set.
Know the ground
Build a terrain model from survey inputs and inspect the assumptions behind the surface.
Set the alignment
Move from design intent to horizontal and vertical controls, with model checks that expose problems before plotting.
Coordinate systems
Analyze how site grades, pipes and structures fit together. The roadmap includes additional engineering rules and calculations.
Issue intelligible plans
Prepare plan/profile outputs and collect review notes. The exact end-to-end publishing path should be demonstrated with a real site.
The civil and site field pack (FL.3) would bring templates and calculation sheets together. Its status on the roadmap: built.