Release planning

CadCraft 0.8 impact map

Every fix and feature lined up for 0.8, and what each one touches: which apps, and which layers of the stack.

ProjectCadCraft
Sheet0.8 impact
Items297
Date2026-11-01
1Fix
269Feature
2Spike
0Platform
2Site ops
2Sanity check
21Decision
≈ 0days in the written 0.8 plans
  • Planned 0 on the plan for the release it is filed under
  • Built 297 built and working in /lab (the dev builds). Whether the public has it is its reach: "in the lab", "Live" (the last gate) or "switched off"; see docs/REACH-LIVE.md
  • Partly built 0 part of it is built in /lab; the rest waits (see "Waits on")
  • Promised 0 the live site already says it is coming
  • Moved 0 moved here from an earlier release or wishlist
  • Found 0 bug found after a release shipped; fixed in a point release or the next one
  • Candidate 0 recommended in a spike or session log; owner to choose
  • Community please test 0 built and in /use; a Discord post gives the steps and the expected result and asks people to try it on their own devices, files or know-how
  • Decision Time 0 a decision, check, file, key, flag or go only you can give; folds into the list once answered

Built means built and working in the lab. Live means the public can use it, and is the last gate: 293 Built · Live, 4 Built · in the lab.

Sheet 1 · impact areas

Where 0.8 lands

How many items touch each app and each layer, by kind. One item can touch several areas, so the rows add up to more than the item count. Pick a row to filter the schedule below.

Impact areaFixFeatureSpikePlatformSite opsSanity checkDecisionAll
Apps
CadCraft – 104 1 – 1 1 6 113
BimCraft 1 138 – – 1 1 4 145
ModelCraft – 63 1 – 1 1 3 69
MarkupCraft – 40 – – – 1 2 43
TakeoffCraft – 40 – – – 1 3 44
CivilCraft – 87 – – – 1 3 91
DetailCraft – 45 – – – 1 3 49
PartCraft – 97 1 – 1 2 7 108
Studio – 13 – – – 2 6 21
SuperCad Studio – 120 – – – – – 120
Layers
Site and services – 9 – – 1 – 9 19
Desktop host – 6 – – – 1 1 8
App shell – 17 – – – – 1 18
App code – 183 1 – – – 5 189
Our engines – 31 – – – – 1 32
Vendor engines – 2 – – 1 – – 3
Drawing surface – 4 – – – – – 4
Help and words – 9 – – – – 1 10
Tests and tooling – 3 – – – – 1 4

Sheet 2 · schedule

Every fix and feature

Grouped by track. App chips carry each app’s layer colour; Studio is in ink. "Waits on" names what has to happen first; the small lines under it say who asked and where the item is written up.

Add an item Fork map (Rust and C++ forks) The roadmap

Issues sync every 10 minutes; last sync Nov 1, 2026 4:00 pm.

ItemWhatAppsLayersStatusDaysWaits onIssues
Decision Time 25
FeatureDEC-7 Link to DEC-7 Invite link lifetime

8 hours (current), 1 hour, or until the host ends. DECISION: Allow user to set default in Studio settings, and adjust in advanced options at link creation time. Default 1 hour (owner, 2026-10-25).

Studio Desktop host Built · Live – Build: Studio setting + per-link option, default 1 hour From: asked of the owner by: 0.5-PLAN decision 7 (Session) 0.5-PLAN decision 7
DecisionDEC-13c Link to DEC-13c Store listings as Studio only

Confirm the stores list Studio only (recommended). Moved out of Decision Time 2026-10-17: Store listings name Studio only, as recommended. DECISION (owner, 2026-10-25): yes, the stores list CadCraft Studio only.

Studio Desktop host Built · Live – – From: asked of the owner by: 0.5-PLAN decision 13 (Session) 0.5-PLAN decision 13
Suggest an item

Anyone can send one; no account and no name needed. The team reads each idea, and the ones we take on appear on this page. Please leave out web addresses.