Workflows

One building. Four kinds of work.

A simple building change can affect a model, a drawing package, the review notes and the measured quantities. This walkthrough is designed to show which parts actually stay connected and which still involve a handoff.

Design to quantities

Step by step

BimCraft with bimcraft-house.ifc open (48 elements): Model tree, storeys and element counts, units set to Meters, terrain unticked in the tree, and the house in 3D.
BimCraft Draw in Split after the entry door was dragged along its wall: the door selected in 3D and its Properties showing From the start 1.58 m and From the end 3.74 m.
MarkupCraft with two plan PDFs saved from BimCraft and opened by hand (before and door moved), Compare › Changed lines marking the entry door, and a reviewer's callout.
TakeoffCraft with the takeoff BimCraft handed over: sheet at scale 1:200, the entry door item highlighted (1 EA), Items list, and quantities with their waste values.

Keep exploring