Capital and operating cost

Estimates the purchased and installed cost of process equipment and the yearly cost of its energy.

How the precision is kept

The arithmetic is a handful of 64-bit expressions. The numbers are textbook correlations whose constants, the file says, were typed from memory and must be compared with the book; the result is a base-year (2001) cost unless the person supplies a cost index. The calculator states an accuracy of ±30 to ±50 % with every result.

Calculations under this policy

5 calculations in 1 source file. The code is read from the released app when this page loads. It is the calculation people run, not a copy kept for this page.

process/cost.js CadCraft 0.8.2 64-bit 5 calculations Reviewed

Tests tools/process-test/test.mjs

Purchased cost of one item

64-bit

The purchased cost of an equipment item of a given size, in base-year dollars or scaled by a cost index.

C₀ = 10^(K₁ + K₂ log₁₀ A + K₃ (log₁₀ A)²); C = C₀ × I_now ÷ I_base

One logarithm and one power. The K constants are typed to four or five digits and marked as not yet checked against the book; the notes returned with the cost say so.

  • process/cost.js
  • lines 25 to 34
  • CadCraft 0.8.2
/** Base-year purchased cost (US$) of equipment `kind` at size A, with the problems (outside the correlation's range, constants unchecked). */
export function purchased(kind, A, index = null) {
  const e = EQUIPMENT[kind]; if (!e) throw new Error('unknown equipment ' + kind);
  const l = Math.log10(A), c0 = Math.pow(10, e.K[0] + e.K[1] * l + e.K[2] * l * l), notes = [];
  if (A < e.min || A > e.max) notes.push(`size ${A} ${e.unit} is outside the correlation's range ${e.min}–${e.max} ${e.unit}`);
  if (e.check) notes.push('the correlation constants have not been checked against the book yet');
  const ratio = index && index.now ? index.now / (index.base || TURTON_BASE.cepci) : null;
  if (ratio == null) notes.push('no cost index given: this is a ' + TURTON_BASE.year + ' base-year cost');
  return { base: c0, cost: ratio == null ? c0 : c0 * ratio, indexRatio: ratio, year: ratio == null ? TURTON_BASE.year : null, notes, unit: e.unit };
}

Six-tenths scaling

64-bit

A known cost scaled to another size.

C₂ = C₁ (A₂ ÷ A₁)^n, n = 0.6 unless given

One division and one power. The exponent is a rule of thumb.

  • process/cost.js
  • line 35
  • CadCraft 0.8.2
export const scale = (c1, a1, a2, n = 0.6) => c1 * Math.pow(a2 / a1, n);

Installed cost

64-bit

The installed plant cost from the purchased equipment total.

installed = purchased × Lang factor (3.10 solid, 3.63 solid–fluid, 4.74 fluid)

One multiplication by a factor of three significant digits.

  • process/cost.js
  • line 36
  • CadCraft 0.8.2
export const installed = (purchasedTotal, kind = 'fluid') => purchasedTotal * LANG[kind];

Energy cost

64-bit

The cost of energy per hour and per year for a list of powers and prices.

per hour = Σ |P| ÷ 1000 × price; per year = per hour × hours (8000 unless given)

Items are added in list order. An item with no price is named in the result and not added.

  • process/cost.js
  • lines 37 to 42
  • CadCraft 0.8.2
/** Operating cost per second and per year: items [{ name, power (W), price ($/kWh) }], hours per year. Items without a price are listed, not guessed. */
export function operating(items, hours = 8000) {
  let perHour = 0; const rows = [], missing = [];
  for (const it of items) { if (it.price == null) { missing.push(it.name); continue; } const c = Math.abs(it.power) / 1000 * it.price; perHour += c; rows.push({ name: it.name, perHour: c }); }
  return { perHour, perYear: perHour * hours, rows, missing };
}

Equipment cost table

64-bit

The cost of every item, the purchased total and the installed total.

purchased = Σ cost of the rows; installed = purchased × Lang factor

The total is a plain sum in row order, kept unrounded.

  • process/cost.js
  • lines 43 to 48
  • CadCraft 0.8.2
/** Equipment list → cost table: rows [{ name, kind, A }] ; returns purchased, installed (Lang), totals and the notes. */
export function capital(rows, { index = null, plant = 'fluid' } = {}) {
  const out = []; let total = 0; const notes = new Set();
  for (const r of rows) { const p = purchased(r.kind, r.A, index); out.push({ ...r, cost: p.cost, base: p.base }); total += p.cost; p.notes.forEach((n) => notes.add(n)); }
  return { rows: out, purchased: total, installed: installed(total, plant), lang: LANG[plant], notes: [...notes], sources: COST_SOURCES };
}

In detail

Method
log₁₀ C = K₁ + K₂ log₁₀ A + K₃ (log₁₀ A)² (Turton et al., App. A, as cited); six-tenths scaling; Lang factors; index ratio.
Number types
64-bit numbers. Constants of four or five significant digits, each equipment entry flagged check: true.
Checked by
tools/process-test/test.mjs checks that the library copy of purchased reproduces its own formula for a pump; the copy is byte-identical.
Limits
A size outside the correlation's range is computed anyway and noted. An energy item without a price is listed and left out of the total.

Approach: 64-bit, stated limit

The arithmetic is 64-bit, but the method or the data sets the accuracy: a solver tolerance, a mesh, a step size, a datum shift, a table. The limit is stated where the result is shown.

Every policy that takes this approach