FeatureBuilt · in the lab
Lightning, earthing and busbars
Lightning protection of a structure with a sphere rolled over the 3-D model, an earthing grid's step and touch voltages against the tolerable values, and short-circuit forces on rigid and flexible busbars.
Use this add-on:
Screenshots and a short video come with the listing (AL.3).
Overview
Lightning, earthing and busbars is a first set of substation and structure checks in one panel. It rolls a lightning sphere over a 3-D model (or a box you type) and its air terminals to show where lightning can strike, gives the protection angle, the mesh and down-conductor counts and the separation distance for the protection level you choose. It checks an earthing grid's resistance and its mesh and step voltages against the voltages a person can stand, by the method of the IEEE earthing standard. And it works out the short-circuit forces on rigid and flexible busbars the way the IEC busbar standard does.
In BimCraft the sphere is rolled over the open model's solid shapes. In CadCraft the earthing grid is drawn into your drawing as ordinary entities. Every result is an aid for an engineer to check, not an approval or a certificate. No value was read in the standards themselves: each one names the standard, the clause or table, and the public document where it was read, and anything that could not be found is marked "not checked against the standard".
Who it’s for
- An electrical or substation engineer who wants a quick earthing grid check or a busbar force before a full study.
- A lightning protection designer looking for the places a structure needs more air terminals.
- A building designer who wants to see where the rolling sphere touches the model.
- A student learning the rolling sphere, step and touch voltage and busbar electrodynamics on numbers they can change.
What you can do
- Roll a sphere of the radius of the protection level (20, 30, 45 or 60 m, or your own) over a 3-D model or a typed box, with rods and conductors as air terminals, and list and draw the places it can touch.
- Give the protection angle for a rod's height and the penetration depth of the sphere between two terminals.
- Count the mesh conductors and the down conductors for the level, and work out the separation distance from the number of down conductors and the material.
- Check a rectangular earthing grid, with or without rods: resistance, ground potential rise, mesh voltage and step voltage against the tolerable touch and step voltages for a 50 or 70 kg person and a surface layer.
- Suggest a closer conductor spacing when the mesh voltage is over the limit.
- Work out rigid busbar forces, stresses and support forces for two- and three-phase faults, with sub-conductors.
- Work out flexible busbar pull, swing angle and swing-out for a span, with the fall force when it applies.
- Load the published worked examples and see how your numbers compare.
- Save the project, a calculation page and a CSV file.
- Lay out a station in 3-D from generic equipment (breakers, disconnectors, transformers, arresters, busbars), check clearances between bays and the busbar height, roll the sphere over it with masts, and save it as an OBJ file. 3-D substation layout. verified
- Solve a lattice tower as a 3-D truss under conductor weight, wind and unbalance: bar forces, leg reactions, head deflection, bars over the limit. Tower statics. verified
- Find a corridor for an overhead line over a cost grid with a price on every angle, or take the cost from the slope of the ground in CivilCraft. Line routing. verified
- Fit a two-layer soil to Wenner readings and use the result in the earthing grid. Layered soil from field readings. verified
- Assess the lightning risk of a structure by the risk-component method against a tolerable risk. Lightning risk management. verified
Methods and standards
- Rolling sphere: a grid of 0.25 to 2 m finds the places the sphere can reach from the sky; sphere positions near the surface are then moved exactly onto it with exact distances to the model's triangles and to the air terminals. A contact point on the structure counts as exposed only when the sphere there touches no terminal. The result is good to about one grid step and says so. - Protection angle: the printed rows of the angle table by height and level, with a straight line between rows (marked interpolated), and no angle above the sphere radius. - Penetration depth: p = r minus the square root of (r squared minus (d over 2) squared). - Separation distance: s = ki times kc over km times l, with kc from the number of down conductors. - Earthing: the formulas of the IEEE earthing standard as printed in public worksheets, a master's project and a committee tutorial: surface layer factor, tolerable voltages, Sverak's resistance, the geometry factors n, Kii, Kh, Km, Ki, Ks, the mesh and step voltages. - Busbars: the formulas of the IEC busbar standard as printed in a switchgear manual and a technical brochure: the force between conductors, bending and sub-conductor stress, the support force factors without a frequency calculation, and for flexible conductors the pull and swing by the simplified method.
The layout is a set of boxes and prisms placed from a bay list, checked pair by pair for the gap between live bodies of different bays; tower statics use the direct stiffness method on a pin-jointed 3-D truss; line routing is Dijkstra's algorithm over cell and heading with a cost per turn; the layered soil is the two-layer Wenner image series fitted to the readings by least squares on the logarithm of the apparent resistivity; the risk is the sum of the components N P L against a tolerable value, with the collection area L W + 6 H (L + W) + 9 pi H^2.
Data and sources
Every number from a standard carries the standard, the clause or table and where it was read, and none was read in the standard itself: - Lightning levels, angle table, penetration table, ki, kc, km: IEC 62305-1 and 62305-3 as printed in the DEHN Lightning Protection Guide, 3rd edition, December 2014 (Tables 5.1.1.1 to 5.1.1.4, 5.2.1.1, 5.6.1, 5.6.2). - Busbar formulas and support table: IEC 60865-1:1993 as printed in the ABB Switchgear Manual section 4.2 and in CIGRE Technical Brochure 214 (2002). - Earthing formulas: IEEE Std 80 as printed in a public worksheet for Annex B example B.1, an MSc project (CSU Sacramento 2012) and a 2011 IEEE committee tutorial. Not found in any public source, and marked in the panel: the dynamic factors of the busbar standard as formulas (they are curves), psi and the largest swing angle for flexible conductors (charts), the section factor of a solid round bar, the rule for the least number of down conductors, the standard's own printed figures of its worked examples.
Verification
| Case | Result |
|---|---|
| Rolling sphere against closed forms | A 5 m rod under a 20 m sphere over a wide roof: the nearest exposed roof point is at 13.25 m, the closed form sqrt(2 r H - H^2) gives 13.23 m. Class III (45 m): 20.6 m expected, found within 1.2 m. Two rods 20 m apart with a 20 m sphere: the middle of the roof is exposed at 2 m rod height and protec |
| Protection tables as printed | The protection angle rows read from the DEHN guide, the penetration depths of its Table 5.1.1.2 (every one within 0.005 m of the formula), the radius formula r = 10 I^0.65 within 6 percent of each level's radius, and its two worked kc cases 0.51 and 0.7. The standard itself was not read (bin/test-su |
| Earthing grid against a published worked example | The first example of the earthing standard's annex as recomputed unrounded in a public worksheet: tolerable step 2696.097 V and touch 840.548 V, grid resistance 2.776 ohm, potential rise 5296 V, n 11, Kii 0.57, Kh 1.225, Ki 2.272 as printed. Km 0.8896 against the worksheet's 0.883 and mesh voltage 1 |
| Earthing grid with rods against a second example | A 144 by 120 m grid with 22 rods from an MSc project: Cs 0.6997, tolerable step 2230 V and touch 680.6 V, resistance 0.2555 ohm, potential rise 2401.9 V, n 6.468, Ks 0.373786 as printed; Km within 0.25 percent and mesh voltage within 0.2 percent of the project's figures (bin/test-substation.mjs) |
| Rigid busbars against a published worked example | Three phases of three 80 by 10 mm bars, span 0.8 m, peak current 90 kA: force 9051 N (printed 9041), sub-conductor force 3130 N, total stress 10042 N/cm2 (printed 10037), force on the supports 14277 N (printed 14321), natural frequency 81.97 Hz (printed 82.4). IEC 60865-1:1993 as printed in a switch |
| Flexible busbars against a published worked example | Two 1000 mm2 aluminum conductors, span 42.5 m, 50 kA, 1 s: force per metre 57.35 N/m, r 0.697, swing 34.9 degrees, bc 1.53 m, Tres 2.06 s, delta_k 66.5, phi 0.656, Es 23791 N/mm2, pull 20730 N, fall force 56961 N (ours 57015 with the norm and psi given as printed), CD 1.095, swing-out 1.01 m. The pr |
| Layout mesh and clearances | A box body's mesh volume is w d h and an 8-sided prism's is (n/2) r^2 sin(2 pi/n) h; the OBJ file reads back with the same vertices and faces; squeezed bays clash and a generic layout clears its own clearance at every level; masts do not raise the exposed share of the sphere (bin/test-substation2.mj |
| Tower statics against the two-bar truss | Bar force P/(2 sin t) and deflection N L/(E A sin t) as the closed forms; the reactions of a 30 m lattice tower carry the load and balance the moment about the base; twice the stiffness gives half the deflection (bin/test-substation2.mjs) |
| Line routing against a path worked by hand | Around a wall on an eight-neighbour grid the shortest path is 18 sqrt 2 + 14 cells, as worked by hand; an open grid gives the straight line; a closed wall is reported as no route (bin/test-substation2.mjs) |
| Layered soil against the Wenner series | The series summed by hand for 100 over 300 ohm m, 2 m thick, at a 2 m spacing gives 121.03 ohm m; small and large spacings give the layers' own values; a fit recovers four made-up soils within 1 percent for the resistivities and 2 percent for the thickness (bin/test-substation2.mjs) |
| Risk arithmetic worked by hand | Collection area of a 30 m by 20 m by 12 m structure 8271.5 m2 as worked by hand; the components multiply as N P L; a class III system divides the physical-damage component by 10. The values themselves are not checked against the standard (bin/test-substation2.mjs) |
Limits
This is a design aid, not an engineering approval: it does not replace the judgement, the checks and the sign-off of the person responsible for the work, and nothing you build from its figures should rest on it alone.
- An aid, not an approval or a certificate. An engineer must check every result against the standard and the site. - No value was read in the standards themselves; the panel says "not checked against the standard" where it applies. - The sphere is rolled on a grid, so positions are good to about one grid step. Very large models are thinned. Terminals are rods and straight conductors only; the model's own metal parts are not terminals. - The angle method is given as a table lookup; no rule for angles between the printed heights is known, so a straight line is used and marked. - Earthing: rectangular grids only; the resistance is one equation for the whole buried length; the decrement and split factors are yours. Our formulas give a mesh voltage 0.7 percent above one published recomputation of the first example and 0.25 percent above the other; the cause was not found. - Busbars: the dynamic factors use the rule for no frequency calculation. For flexible conductors psi and the largest swing angle are inputs. The published example's support stiffness value does not reproduce its printed stiffness norm, so the norm is an input there. - Not covered: surge protection of equipment, soil models in layers, finite-element earthing, arc flash, busbars with thermal effects other than the heating constant. Second part: the equipment in the layout is generic in size, the clearances and the minimum height are placeholders marked not checked against the standard, gantries and cables are not drawn; tower statics are a pin-jointed truss with the loads at the head, no wind on the tower body, no ice, no load cases or partial factors and no buckling curves; line routing finds a corridor only (no span limits, no clearances, no towers placed) and in CivilCraft reads slope only; the soil fit uses the textbook two-layer series, and the single value for the grid is the apparent resistivity at the grid's equivalent radius, not the standard's method; the risk formulas and tables were typed from public guides to IEC 62305-2 and are marked not checked against the standard, and services entering the structure are left out.
Files and formats
Reads and writes its own project file (.json: the typed values). Writes a calculation page as Markdown and the results as CSV. In CadCraft it writes lines, circles and text on GROUND- layers, which export to DXF and DWG. In BimCraft it reads the open model's solid shapes and writes nothing into it. Files are read in your browser; nothing is sent anywhere. Writes the 3-D layout as an OBJ file and as JSON, and a line route as CSV.
Get started
- Switch the add-on on in Settings, Add-ons, then open the Lightning, earthing and busbars tab.
- Under Lightning protection press Rods at the corners, then Roll the sphere, and read where the sphere can still touch the roof.
- Under Earthing grid press Check the grid on the first example and read the mesh voltage against the tolerable touch voltage.
- Under Busbar short-circuit forces pick Rigid or Flexible, load the published example and press Calculate.
- Open Sources and marks to see where each value was read and what is not checked against the standard.
- Open 3-D substation layout, Tower statics, Line routing, Layered soil from field readings or Lightning risk management and press the button in each: every fold starts from an example.
Languages
The text is available in:
- English (en)
Works in
| Edition | Works | Note |
|---|---|---|
| Browser (/use) (yours) | Added on demand | Fetched the first time you use it, then kept for offline use. |
| Studio from getcadcraft.com | Added on demand | Fetched the first time you use it, then kept for offline use. |
| Microsoft Store | Added on demand | Fetched the first time you use it, then kept for offline use. |
| Google Play | Added on demand | Fetched the first time you use it, then kept for offline use. |
| iPad and iPhone (App Store) | Included; switch it on | Part of the reviewed app; your list switches it on. |
| Custom build | Added on demand | Fetched the first time you use it, then kept for offline use. |
Comes with
Nothing else.
Versions
| Version | Channel | Date | What changed |
|---|---|---|---|
| 1.0.0 | lab | November 25, 2026 | First version in the Library. |
Licence and maker