Roadmap 0.11, Land records and field walk add-on (Track LR)
LR.5 Parcel proposals: subdivide, consolidate, move a boundary, change a land use or zone
Built in /lab 2026-11-20. A change is worked out as a proposal first: cut one parcel into equal lots or lots of given areas by parallel lines in a direction the person gives, cut by a line through two points, make adjoining parcels one, move the line between two, or change the land use or zone. The result is drawn, listed before and after, and its ground is balanced (after less before should be nothing). New lots are checked against the person's own lot rules: the smallest lot and the shortest street frontage, for one land use or for every lot. Keep stores the proposal with the drawing; Apply replaces the old parcels with the new ones, each with a record naming what it was made from, as one undo step. Test: a 60 by 40 m lot gives three lots of 800 m2; the three lots given in any order join back into the four-corner parent; a boundary moved 5 m gives 1,000 and 600. Limits: straight cuts only; joining needs a shared side (lots that also meet at a corner, or would enclose a gap, are refused with the reason); frontage is measured only where a parcel's zoning names its street line. No place's lot sizes are shipped.
Community comments
No comments yet
Add detail as we go: how you would use it, files or steps that show the problem, what other programs do. The team reads every comment.
Sign in or create a free account to add a comment.