Roadmap 0.11, Reinforced concrete detailing (Track RC)
RC.3 Reinforced concrete: cross-ties, round columns and spirals, and the other shapes not built
Left out of RC.1 (rc-09 and detail-09 logs). Columns: cross-ties are not drawn (the check ACI 318-19 25.7.2.3 warns when a face has four or more bars or a middle bar over 150 mm clear of a corner bar, and says so); round columns and spirals. Beams: sloped and curved. Slabs that are not rectangles, walls that are not straight. Laps: staggered or cranked, at positions you choose (today equal steps, all bars at one section). Corner bars at openings, punching reinforcement, seismic detailing (ACI 318-19 chapter 18), the general development equation with Ktr (25.4.2.4), excess-reinforcement reduction. Also: copy, paste and move of concrete elements, concrete in GA drawings, clash check, USD, Studio Live for concrete edits (live.js sends no rc ops). Bars from other programs stay as drawn (not turned into editable rules). Owner to choose what is worth a session; cross-ties first.
Community comments
No comments yet
Add detail as we go: how you would use it, files or steps that show the problem, what other programs do. The team reads every comment.
Sign in or create a free account to add a comment.