EngineBuilt · in the lab
Schedules and cost
CPM, 4D/5D, shutdowns.
Built on it
- 5D cost — Costs on the 4D schedule.
- Construction engineering and management — Schedule, cost and carbon engines with trade packs for BimCraft, TakeoffCraft and MarkupCraft, and four calculation sheets: crew duration and labour cost, concrete pour, earned value and bid build-up.
Use it in your add-on
Name it in your manifest's needs. When someone adds your add-on, their account brings this engine too, and every edition loads it the first time your add-on needs it. Version ranges arrive with AL.13.
{
"id": "com.example.my-addon",
"apps": ["bimcraft", "takeoffcraft"],
"needs": ["engine.schedule"]
}
Methods and standards
Critical path method, resource levelling, earned value and Monte Carlo sampling, as the tests exercise them.
Limits
Lab. A planning aid: a schedule is only as good as the durations and logic entered. Not compared with a commercial tool.