Create takeoff items
Make linear, area and count items and set their unit, height or depth, waste and material and labor rates.
Written for TakeoffCraft 0.11. The same help is inside the app: press F1.
An item is one thing you measure and price: a wall type, a floor finish, a ceiling, a door, a light fixture. Every mark you draw belongs to an item. Other programs call these conditions.
Each item has a type (and can take other kinds of marks too, see One item, several kinds of marks):
| Type | You draw | It reports | Units |
|---|---|---|---|
| Linear | Runs of connected points | Length, number of runs, and wall area when it has a height | LF or m |
| Area | Closed outlines, with cut-outs | Area, perimeter, number of areas | SF, SY, SQ, ac, ha or m² |
| Count | One click per thing | How many | EA |
| Typed quantity | Nothing: you type the quantity | The number you typed (or one brought in from CivilCraft) | LS, EA, CY, m³, lb, TON, kg, t, LF, m, SF, SY, SQ, ac, ha or m² |
Typed quantities (no drawing)
Some things in an estimate are never drawn: mobilization, permits, a contingency, a lump-sum subcontract, the cut and fill CivilCraft worked out. Make them a Typed quantity:
- Choose New item, type a name, pick Typed quantity (no drawing) and choose Add.
- In the item editor pick the Unit (LS for a lump sum) and type the Quantity:
1,2.5or1,250. - Set waste and rates as for any other item. An assembly's formulas use
Q, the quantity, for exampleceil(Q / 12)truck loads.
A typed quantity takes no marks and never makes the estimate incomplete. When the takeoff has bid areas, the editor also has Bid area: the quantity then counts in that area, its alternates and its totals, just as a mark there would. Quantities brought in from another app say where they came from, see Earthwork and spot elevations.
Make an item
- In the Items panel on the right, choose New item.
- Type a name, like
Interior wall type AorCarpet tile. - Pick the type: Linear (length), Area or Count.
- Choose Add (or press ReturnEnter). The item appears in the list with its own color, becomes the item you draw with, and its editor opens below the list. The status bar tells you which tool to pick next.
Press EscEsc in the form to close it without adding an item.

Pick the item you draw with
Click an item in the list. It becomes the item new marks go to, and its marks are highlighted on every sheet while the others fade. If the open sheet has none of its marks, TakeoffCraft jumps to a sheet that has. Click the item again to stop highlighting; it stays the item you draw with.
Clicking a mark with the Select tool also makes its item the current one.
Set up the item
The item editor (Item: (name)) has these fields. Each one is saved when you leave the field or press ReturnEnter, and each change can be undone.
| Field | What it does |
|---|---|
| Name | Shown in the list, the tables and the exports. |
| Type | Linear, Area or Count. It is locked once the item has marks ("An item with marks keeps its type"). |
| Color | The color of its marks on screen and in the marked PDF. |
| Unit | What the quantity is reported in: LF or m for linear; SF, SY, SQ, ac, ha or m² for area; EA for count. |
| Also measure | The other kinds of marks the item takes, each with its own unit. See below. |
| Height (linear) | A wall height. The item then also reports wall area (length × height). Runs that came from a BimCraft model carry their doors and windows: those are taken out once, and the item says the gross area, the openings and the net. A takeoff from a BimCraft project that chose a measurement method is measured by that method here too (the note names it, with its source, and says it is unchecked by a quantity surveyor); the method cannot be changed in TakeoffCraft. Bricks or blocks and mortar from a wall type arrive as two components: the units to order and the mortar volume. |
| Depth (area) | A depth or thickness, used in assembly formulas (for example concrete volume). |
| Waste % | Added to the quantity before pricing: 10 means quantity × 1.10. |
| Material $/LF | Material cost per unit. The label follows the unit: $/SF, $/EA and so on. |
| Labor $/LF | Labor cost per unit. |
| CSI number | Its CSI MasterFormat number, like 09 21 16 (or just the division, 09). The workbook's By division worksheet groups costs by it. Items from trade packs have one already. |
Height and depth take feet and inches (9'-0", 8' 6") or decimal feet (9) for imperial units, and meters (2.7, 2700 mm) for metric units. Rates take amounts like 12.50 or $1,250, up to four decimals. See Length, rate and percent entry.
Below the fields, Measured shows the totals the item's formulas can use, with their letters: Length (L), Runs (N), Wall area (A) for linear; Area (A), Perimeter (P), Areas (N) for area; Count (N) for count.

One item, several kinds of marks
Some things are measured more than one way: a room has a floor (an area), a base along its walls (a length) and doors (a count). Instead of three items, make one:
- Make the item with its main type, such as an area item
Room 101. - Under Also measure in its editor, tick Linear, Count or both. Each one gets a unit next to it.
- Draw with any tool whose kind the item takes: with
Room 101current, Area draws its floor, Linear its base and Count its doors. TakeoffCraft does not ask for another item.
The items list shows every quantity (50.00 SF + 2 EA). In the quantities table the item's row has its main quantity, and each other kind gets its own row below it, such as Room 101 (count), with its own waste and material and labor rates. The exports, the per-sheet table and the marked PDF's legend list them the same way.
The main type's fields stay the main type's own: the height or depth, the pitch, back-outs and the 3D shape apply to its marks only. A base run drawn for an area item is measured plainly along the plan, and shows flat in 3D. Assembly formulas use the main type's totals.
A kind can be unticked only while the item has no marks of it; delete them, or move them to another item under Selected mark, first. Marks can move to any item that takes their kind.
Further down is the Assembly: components such as studs or board, each with its own formula and rates. See Assemblies and formulas.
At the bottom: Move up and Move down change the item's place in the list and in the exports, and Delete item removes it with all its marks (after asking; you can undo it).
Area items also have Pitch (roof planes measured on the slope: Roofs and slopes) and Back-out (their marks come off other items' areas: Measure areas). Linear items have Slope (Level, Rake, Hip or valley) and, for rakes and hips, Pitch.
Rates in the table
You can also type Waste %, material and labor rates straight into the Quantities table at the bottom (By item). It is the same setting as in the editor.
How pricing works
For each item and each assembly component:
- With waste = quantity × (1 + waste %).
- Material = with waste × material per unit, rounded to the cent.
- Labor = with waste × labor per unit, rounded to the cent.
- Total = material + labor.
The Job total adds every item and every component. An item can carry its own rates and an assembly at the same time; both are counted, so leave the item's rates at 0 when its components carry the cost.
Labor by crew
Instead of a labor rate per unit, an item's labor can come from a crew: how much it puts in per hour, how many people, and what each earns. Under Labor by crew in the item editor, tick Price labor from a crew and fill in:
| Field | Example |
|---|---|
| Production | 20 LF an hour (in the item's unit) for the whole crew |
| Crew size | 2 people |
| Wage $/hour each | 45 |
TakeoffCraft works out, from the quantity with waste:
- crew-hours = quantity ÷ production (110 LF ÷ 20 = 5.5),
- worker-hours = crew-hours × crew size (11),
- crew-days = crew-hours ÷ 8 (0.69),
- labor = worker-hours × wage ($495.00).
The editor shows the result and the rate it comes to ($4.50/LF). The item's own labor rate is then read-only, in the editor and in the table. The header of the Quantities table adds the job's worker-hours and crew-days. The exports note each crew's hours, and in the workbook the labor cell is a formula on the crew (ROUND(F2/20*2*45,2)). Untick the box to go back to a rate per unit.

Metric items
Pick m (linear) or m² (area) as the unit. Quantities, heights and formula values are then in meters. The sheet scale can be any preset or calibration; units and scales are independent.